activities

Here you will find our different dissemination activities as well as access to  public deliverables developed throughout the project.

news

activities - intro workshop

Kick-off meeting

INTERACT project kick-off meeting started in February 2021 with a two-day workshop dedicated to the LINK-based holistic architecture.

read more

work packages

Interact activities are structured into following seven work packages:

    • WP1 is the Project Management and WP7 contains all dissemination activities.
    • In WP2 successful PED approaches will be analysed, a competence network for the INTERACT regions established, and success factors of best practice described.
    • In WP3 the current status of the INTERACT regions will be documented, a gap analysis to the required infrastructure done, and the future design of the LINK architecture established.
    • In WP4 the technical design of the energy community including interfaces between stakeholders and use-cases will be developed, and the LINK-based market designed.
    • In WP5 the legal framework, business models, economic evaluations and potential contracting models will be established.
    • All generated knowledge will be tuned to the special requirements of the INTERACT regions and integrated into a specific Roadmap for each energy community within WP6.
activities - work packages

Interact activities are structured into following seven work packages:

  • WP1 is the Project Management and WP7 contains all dissemination activities.
  • In WP2 successful PED approaches will be analysed, a competence network for the INTERACT regions established, and success factors of best practice described.
  • In WP3 the current status of the INTERACT regions will be documented, a gap analysis to the required infrastructure done, and the future design of the LINK architecture established.
  • In WP4 the technical design of the energy community including interfaces between stakeholders and use-cases will be developed, and the LINK-based market designed.
  • In WP5 the legal framework, business models, economic evaluations and potential contracting models will be established.
  • All generated knowledge will be tuned to the special requirements of the INTERACT regions and integrated into a specific Roadmap for each energy community within WP6.
activities - work packages

deliverables

Del. no. Deliverable name WP no. Delivery date Download
D1.1 INTERACT First Year Activity Reporting 1 M14
D1.2 INTERACT Second Year Activity Reporting 1 M24
D2.1 Competence Map 2 M6
D2.2 Stakeholder Needs Evaluation 2 M7
D2.3 Key success factors and requirements for INTERACT energy communities 2 M10
D3.1 Common Inventory Methodology for recording current technologies 3 M5
D3.2 Gap analysis including the list and description of existing technologies and infrastructure as well as necessary replacements/upgrades/additions to the infrastructure and measuring devices 3 M15
D3.3 LINK-ICT structure with communication guidelines between the actors within the electricity community 3 M18
D4.1 Design of the Energy Community Organisation according to the LINK-Solution 4 M12
D4.2 Use Cases for the integration of the existing innovative technologies with the LINK-solution 4 M17
D4.3 Market structure and its interfaces with the Energy Community 4 M19
D5.1 Current legal framework and differences between the PED-Call target countries 5 M15
D5.2 Business cases for the INTERACT energy community 5 M18
D5.3 Required contracting models and economic evaluation of the solution 5 M21
D6.1 Roadmap for the implementation of the designed INTERACT energy community in general and for the specific local perspectives 6 M24
D7.1 Dissemination implementation plan / First version M2 and updates every 6 month after 7 M2
D7.2 Project Website 7 M4
D7.3 Materials made for design workshops, website and social media including (content, illustrations, banners, animations and infographics for complex information), with ongoing updates and additions 7 M3
– Poster 7 M3
– Flyer 7 M3
– Video 7 M3
– Newsletter 7 M3
– Academic papers 7 M3
D7.4 Final Dissemination report and Info-Flyer about the established Roadmap 7 M24